LankeCMS LOGO
COB LED Downlight
Hits:2379
led fully adjustab
Hits:2488
led flood light 10
Hits:2743
LED Flood Lights 3
Hits:3302
ABOUT US Home > Payment&Shipping
Payment&Shipping

Payment Instruction

We accept TT, L/C, Western Union, MoneyGram and Paypal for payment.
* Please select your best and right payment option for your order.

T/T (Telegraphic Transfer)
Bank transfer is the least expensive way to pay for your order; by far the vast majority of orders are paid by TT.
Please Email Us for TT payment instruction.

Please kindly send us the bank slip for our easy tracking after you paid it via bank transfer.

 

Confirmed irrevocable L/C at sight (Letter of Credit)

L/C transaction is conventional and safe, but the process is expensive and it usually takes longer time to complete. We take L/C payment only for orders in the amount of over US$100,000

Western Union and MoneyGram
Western Union and MoneyGram are easy, quick and safe ways to pay for samples or any other small amount orders.
Please Email Us for WU&MG payment instruction.

Please kindly let us know “Money Transfer Control Number (MTCN)” or “Reference Number”, 

"first name and last name of Sender”, "Amount and Currency” after you paid it via Western Union or MoneyGram.

 

Paypal

Paypal is safe, easy and quick way to pay for samples or any other small amount orders if you have a Paypal account.

Please Email Us for Paypal payment instruction.

Please Note: in China, the Paypal charge fee is very expensive, so if you use Paypal to pay for your order, you should pay extra Paypal charge fee per transaction :

" 4.4% + $0.30 USD or a similar fixed fee in the currency received "

 


Order Procedure

With international courier shipping or with our full package shipping service, the whole process is the same as buying from your local distributors: you issue and confirm an order, the shipment will come to your door in as little as three to five working days, and the shipping cost is not much higher than domestic shipping!

1. You request a price quote, our sales staff will write or fax back within one business day with the  requested price information, including shipping options and lead time estimate.

2. You agree with the price, and make a choice on shipping method. 

3. We send a Profoma Invoice.

4. After making sure all information is correct, you make payment. TT (bank transfer) and Western Union&MoneyGram are preferred; L/C payment is acceptable.

5. We confirm the payment and ship the goods. For orders of our standard products, this is normally done within three to five working days; shipping time for OEM orders is determined case by case.


Lead Time

Lead time for LED products ranges from a week to much longer time, and will be specified in the project contract.

For orders of other signage items and lighting products, if the quantity is less than 1000 units, and is for white, red and RGB color, we can usually dispatch shipment within three to five working days, this includes the following products:

LED lamps, including E27, MR16, GU10, PAR bases
LED fluorescent tubes
LED flex strips, high voltage&low voltage, black and white board
LED ceiling light
LED corn bulb, both regular and waterproof type
LED flood lights, both single color and RGB color type
LED panel lights, both round and flat type
LED RGB color change controllers – both AC and DC power type
12/24V DC power supplies

Lead time for orders of products of other colors will differ, please check with our sales/services team.


Shipping Options

International Express Shippingexpress shipping
DHL, UPS, FedEx, EMS and TNT have daily services from China to all major cities around the world, delivery time is two to five working days.
Shipping and handling costs usually amount to 5% to 10% of order amount, depending on the products and order volume.
This is a door to door delivery service, the courier will handle customs clearance automatically on your behalf.

Regular Air Shipping
If your order package is 100 kg or above, we can arrange to use Air Cargo shipping, with lower shipping cost; delivery time ranges from three to ten business days, depending on the city you ship to.

Sea cargo

Sea Cargo
Ocean shipping is for bulky orders, shipping cost per unit is minimal but delivery time varies from 10 to 30 business days, depending on the season and place you ship to. We recommend you use it when your order package is at least two cubic meters.

 

Transit Time:

Transportation Mode

Destination

Transit Time

By sea

(from China Main Ports)

Hongkong / Japan / Korea

3 days

European Main Ports

25~30 days

Black Sea Countries

30~35 days

Middle East

15~20 days

American West Ports

12~14 days by express vessel;

28~30 days by common vessel

American East Ports

40~45 days

Oceania Countries

15~20 days

By Railway or Multi-model Transportation

Countries along the Eurasia 

Continental Railway Line

35 days to Moscow

Note:
Shipment schedule may be delayed during the MAIN holidays in China.


Our Shipping Service Package
For orders that need regular air or ocean shipping, we offer an all-included, door to door service package through our freight forwarder in Hong Kong; shipping rate is low and service is excellent.

 

Links: LEDs Magazine  |   SSLD  |   Strategies  |   LED Professional  |   Lighting Magazine  |   LEDinside  |   ArticlesBase  |  
  CopyRight©2000-2018 SHENZHEN LEDIA LIGHTING CO., LIMITED. All Rights Reserved. 
  Add:A Bldg, Fuxinlin Industrial Park, Hangcheng Industrial Area, Xixiang, Bao`an, Shenzhen, Guangdong, China 518102
  Tel:+86-755-36982004 Fax:+86-755-61673145 E-mail:ledia@ibestlighting.com